> NEWS

Notes before operation of 25T deep throat punch

2018-03-23 00:17:00

1) Check the lubrication of each part and make each lubrication electricity fully lubricated;


2) Check whether the mold installation is correct and reliable;


3) Check whether the compressed air pressure is within the specified range;


4) Check whether each switch button is sensitive and reliable. Be sure to disengage the flywheel and clutch before starting the motor;


5) Make the press carry out several empty strokes to check the working condition of the brake, clutch and control part;


6) Check whether the main motor has abnormal heating, abnormal vibration, abnormal sound, etc.;


7) Add lithium ester oil to the slider with manual oil pump;


8) Check and adjust the gap of feeder roller to the process requirements;


9) Check and maintain the amount of oil mist to meet the requirements;


10) When the motor starts, check whether the flywheel rotation direction is the same as the rotation mark.


Baidu
map